1. Can I repave my driveway in winter?
Repaving in winter is generally not recommended. Specifications prohibit placing asphalt when air or ground temperatures are below 40 °F. Cold weather prevents proper compaction and bonding, leading to premature cracking. If an emergency repair is required, cold‑patch materials can be used, but full repaving should wait until spring or fall.
2. How long does new asphalt take to cure?
New asphalt cools and becomes traffic‑ready within a day, but full curing (oxidation and hardening) takes several months. Most contractors advise waiting about 6-12 months before expecting the pavement to reach its maximum hardness. During this period, avoid heavy loads, chemical spills and sharp objects. Sealcoating should be applied after the pavement has oxidized slightly, usually 30-90 days after installation.
3. Should I sealcoat after repaving?
Yes. Sealcoating adds a protective layer that reduces oxidation, repels water and enhances appearance. For newly repaved driveways, apply a sealcoat after the surface has cured sufficiently (30-90 days) and then reapply every 3-5 years or as recommended.
4. How long does repaving last?
With proper installation and maintenance, a residential asphalt driveway can last 15-20 years. The Federal Highway Administration notes that agencies expect asphalt pavements to last at least 20 years, and preservation treatments can extend life by several years. Regular crack sealing and timely sealcoating help you reach the upper end of this range.
